OVEG

Oxhey Village Environment Group | www.oveg.org

River Colne Improvements

image.jpeg

www.oxheypark.com

4 comments on “River Colne Improvements

  1. Lyn
    22 October 2016

    In very heavy rain the river overflows on the footpath. Will this work reduce the capacity further meaning flooding will happen more often?

    • ajb080264A
      5 December 2016

      Brushwood berms are held low in the channel so in high flows water passes over the top, all such works require EA flood defence consent (now environmental permitting) and a method statement. We need more SuDS type schemes, most of our rivers ecosystems are struggling to cope with misconnections, litter and urban run off. To learn more about things planned and happening on Watford rivers see https://www.facebook.com/groups/952293954853968/

  2. Bill Stephens
    22 October 2016

    Yes but will this stop the flooding? Why is everything made so complicated with a lot of flowery language? Clearing out all the ‘islands’, the trees and rushes and bushes that have grown into the river and cut down the flow are the problem. Dredging is the answer which would give a clear flow to the water and reduce flooding. The river used to be a beautiful clear boating area. Now it looks like the upper reaches of the Amazon!

  3. V Harvey
    22 October 2016

    I think this is a great idea and look forward to seeing more wildlife as a result

Comment

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Information

This entry was posted on 21 October 2016 by in All News, Local News.